The average turnaround time for a full-stack project at Wemaxa depends on the size, complexity, and service tier selected. Each project is unique, but we follow a structured workflow that ensures high-quality results delivered on a realistic and efficient timeline. From planning and design to development and launch, every phase is carefully scheduled to align with your business goals and deadlines.

For projects under the Starter tier, which typically include basic websites or small online shops, the turnaround time is usually 2 to 4 weeks. These builds are streamlined, focused, and involve a more limited scope ideal for businesses looking for a fast, professional launch.
The Professional tier, which covers more advanced websites with custom layouts, added integrations, and more complex content structures, usually takes 4 to 6 weeks. This allows time for custom development, testing, and multiple design iterations if needed.
For Enterprise and App Development tier projects, which may involve larger-scale platforms, custom APIs, user accounts, or cross-platform functionality, turnaround times range from 6 to 10 weeks or more, depending on the number of features, integrations, and third-party tools involved. In all cases, timelines are clearly discussed at the start, and progress is tracked through shared milestones to keep everything on schedule.
🚀 Accelerated Delivery
- Express delivery options available with limited revision cycles.
- Projects with tight deadlines can often be delivered in phases (e.g., launch v1 within 2–3 weeks, iterate on v2).
📋 Factors That Influence Turnaround
- Number of pages/features
- Client response time during feedback rounds
- Revisions or scope changes mid-project
- External integrations (APIs, third-party tools)
⏱️ Typical Turnaround Times
💼 Starter Package (WordPress / Basic Web Presence)
- Timeframe: 1 to 2 weeks
- Includes installation, theme setup, basic customization (up to 4 sections), plugin configuration, and security hardening.
- Suitable for portfolios, microsites, or influencers.
🧩 Professional Package (Custom Design + Backend)
- Timeframe: 3 to 5 weeks
- Includes UI/UX design in Figma or Framer, custom frontend (React.js or Vue.js), backend APIs (Node.js/NestJS), database setup, and deployment.
- Ideal for business websites, client dashboards, or SaaS MVPs.
🏢 Enterprise Package (Fully Custom Scalable Platform)
- Timeframe: 6 to 10 weeks
- Includes product planning, custom architecture, admin panels, user roles, API integrations, performance optimization, and DevOps pipeline.
- Ideal for complex SaaS platforms, CRMs, ERPs, or high-traffic environments.
📱 App Development (Android/Kotlin or Cross-Platform)
- Timeframe: 5 to 8 weeks
- Backend (Firebase or Node.js), Android app UI/UX, core feature integration, camera/media access, and testing.
MORE LINKS:
What is Fullstack?
What is Backend?
Supported Databases
Data storage methods
API creation
3rd party services
Hosting Setup
Backend developer
Project scaling
AVERAGE WEB DESIGN TURNAROUND TIME
At Wemaxa, we understand that the timeline for full-stack development projects can vary significantly based on several factors. Our structured approach ensures that each project is completed efficiently without compromising on quality. Full-stack development encompasses both frontend and backend layers, database architecture, API integration, and deployment strategies. Therefore, timelines can differ depending on complexity, feature requirements, and technology stack.

For simpler projects, such as a basic portfolio or informational website, we can deliver a fully functional product within 1 to 2 weeks. These smaller projects often use reliable frameworks such as WordPress or lightweight frontend frameworks like React.js, ensuring both fast development and ease of future scalability. For more information on basic web development timelines, refer to this article on Onix Systems.

For medium-complexity full-stack projects, which include custom UI/UX design, interactive frontend elements, backend logic, and database integration, the average turnaround time ranges from 3 to 5 weeks. Wemaxa handles the entire process from concept to deployment, beginning with wireframes in tools like Figma or Framer, followed by frontend implementation using frameworks like Vue.js or React.js, backend API development with Node.js or NestJS, database setup with PostgreSQL or MySQL, and hosting deployment on platforms like AWS or Google Cloud. This workflow ensures that each element is optimized for performance, scalability, and security, while also allowing for seamless future updates. For insights into medium-complexity app development timelines, see this article on Itransition.

For large-scale, enterprise-grade full-stack platforms that require advanced architecture, multiple integrations, real-time data handling, complex user roles, and DevOps pipelines, the typical development timeline extends to 6 to 10 weeks or more. Wemaxa takes a holistic approach, starting with product planning and architecture, followed by detailed frontend and backend implementation, rigorous API design and integration, performance optimization, and deployment automation. High-traffic platforms such as CRMs, SaaS solutions, ERPs, or marketplaces benefit from cloud orchestration with Kubernetes, containerization with Docker, and continuous monitoring with tools like Datadog. This approach ensures that enterprise projects are scalable, secure, and maintainable over time. For a comprehensive guide on software development project timelines, refer to this article on Full Scale.

It is important to note that turnaround times are influenced not only by technical requirements but also by project scope, content availability, stakeholder feedback cycles, and testing requirements. Wemaxa emphasizes a collaborative approach, integrating client feedback early through iterative design reviews and staging deployments. By using project management tools like Jira or Trello, we maintain transparency in task completion and milestone tracking. This ensures that clients are fully aware of progress, can make timely decisions, and that the project remains on schedule without compromising quality or introducing technical debt.

In conclusion, the average turnaround time for full-stack development at Wemaxa is highly dependent on project complexity and feature requirements. Smaller projects can be completed within 1–2 weeks, medium-complexity applications in 3–5 weeks, and enterprise-scale platforms in 6–10 weeks or more. By leveraging modern technologies, scalable frameworks, cloud hosting solutions, and agile project management practices, Wemaxa ensures that every project is delivered on time, fully functional, and ready for future growth. Integrating best-in-class tools, third-party services, and robust testing practices guarantees that your full-stack solution is not only delivered efficiently but also built to scale, secure, and perform at high levels for years to come.